- Accessory/Part type: Drive shaft
Choose your filter
Delivery time average 11 days.
2,776.95
€2,295.00 excl. VAT
- Accessory/Part type: Drive shaft
Delivery time average 11 days.
2,776.95
€2,295.00 excl. VAT
- Accessory/Part type: Drive shaft
Delivery time average 11 days.
2,776.95
€2,295.00 excl. VAT
- Accessory/Part type: Drive shaft
Delivery time average 11 days.
2,776.95
€2,295.00 excl. VAT
- Accessory/Part type: Extended reaction arm
Delivery time average 11 days.
2,676.52
€2,212.00 excl. VAT
- Accessory/Part type: Extended reaction arm
Delivery time average 11 days.
2,655.95
€2,195.00 excl. VAT
- Diameter: 133 mm
- Max. capacity: 83,8 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,585.46
€2,136.74 excl. VAT
- Diameter: 133 mm
- Max. capacity: 83,8 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,585.46
€2,136.74 excl. VAT
- Diameter: 102 mm
- Max. capacity: 46,6 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,574.09
€2,127.35 excl. VAT
- Diameter: 102 mm
- Max. capacity: 46,6 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,574.09
€2,127.35 excl. VAT
- Diameter: 102 mm
- Max. capacity: 46,6 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,574.09
€2,127.35 excl. VAT
- Number of connections: 4
- Connection size 1: 3/8"
- Connection size 2: 3/8"
Delivery time average 13 days.
2,539.79
€2,099.00 excl. VAT
- Diameter: 133 mm
- Max. capacity: 83,8 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,504.65
€2,069.96 excl. VAT
- Cutting capacity steel wire rope: 20 mm
- Length: 390 mm
- Cutting force: 6 t
Delivery time average 11 days.
2,504.65
€2,069.96 excl. VAT
- Diameter: 133 mm
- Max. capacity: 83,8 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,504.65
€2,069.96 excl. VAT
- Diameter: 133 mm
- Max. capacity: 83,8 t
- Stroke length: 15 mm
Delivery time average 11 days.
2,504.65
€2,069.96 excl. VAT
- Accessory/Part type: Extended reaction arm
Delivery time average 11 days.
2,484.13
€2,053.00 excl. VAT
- Max. capacity: 100 t
- Technical drawing (C): 35 mm
- Technical drawing (E): 265 mm
Delivery time average 11 days.
2,375.88
€1,963.54 excl. VAT
- Valve type: 3-way valve
Delivery time average 11 days.
2,367.97
€1,957.00 excl. VAT
- Max. capacity: 10 t
- Max. flange thickness: 2 x 92 mm
- Stroke length: 56 mm
Delivery time average 11 days.
2,346.86
€1,939.55 excl. VAT